MPP Field Guide
The tables below provide an indication of which fields are populated when different MPP file versions are read using MPXJ The tables are not hand-crafted: they have been generated from test data and are therefore may be missing some details.
Project
Core Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
AM Text | ✓ | ✓ | ✓ | ✓ |
Activity ID Increment | ✓ | ✓ | ✓ | ✓ |
Activity ID Increment Based On Selected Activity | ✓ | ✓ | ✓ | ✓ |
Activity ID Prefix | ✓ | ✓ | ✓ | ✓ |
Activity ID Suffix | ✓ | ✓ | ✓ | ✓ |
Application Version | ✓ | ✓ | ✓ | ✓ |
Author | ✓ | ✓ | ✓ | ✓ |
Auto Add New Resources and Tasks | ✓ | ✓ | ✓ | ✓ |
Auto Filter | ✓ | ✓ | ||
Auto Link | ✓ | ✓ | ✓ | ✓ |
Bar Text Date Format | ✓ | ✓ | ✓ | ✓ |
Calculate Float on Finish Date of Each Project | ✓ | ✓ | ✓ | ✓ |
Calculate Multiple Paths Using Total Float | ✓ | ✓ | ✓ | ✓ |
Category | ✓ | ✓ | ✓ | ✓ |
Comments | ✓ | ✓ | ✓ | ✓ |
Company | ✓ | ✓ | ✓ | ✓ |
Compute Start to Start Lag From Early Start | ✓ | ✓ | ✓ | ✓ |
Consider Assignments In Other Project With Priority Equal or Higher Than | ✓ | ✓ | ✓ | ✓ |
Content Status | ✓ | ✓ | ✓ | |
Content Type | ✓ | ✓ | ✓ | |
Creation Date | ✓ | ✓ | ✓ | ✓ |
Critical Activity Type | ✓ | ✓ | ✓ | ✓ |
Critical Slack Limit | ✓ | ✓ | ||
Currency Code | ✓ | ✓ | ✓ | |
Currency Digits | ✓ | ✓ | ✓ | ✓ |
Currency Symbol | ✓ | ✓ | ✓ | ✓ |
Currency Symbol Position | ✓ | ✓ | ✓ | ✓ |
Current Date | ✓ | ✓ | ✓ | ✓ |
Custom Properties | ✓ | ✓ | ✓ | ✓ |
Date Format | ✓ | ✓ | ✓ | ✓ |
Date Order | ✓ | ✓ | ✓ | ✓ |
Date Separator | ✓ | ✓ | ✓ | ✓ |
Days per Month | ✓ | ✓ | ✓ | ✓ |
Decimal Separator | ✓ | ✓ | ✓ | ✓ |
Default Calendar Unique ID | ✓ | ✓ | ✓ | ✓ |
Default End Time | ✓ | ✓ | ✓ | ✓ |
Default Overtime Rate | ✓ | ✓ | ✓ | |
Default Standard Rate | ✓ | ✓ | ✓ | |
Default Start Time | ✓ | ✓ | ✓ | ✓ |
Default Work Units | ✓ | ✓ | ✓ | ✓ |
Document Version | ✓ | ✓ | ✓ | |
Editable Actual Costs | ✓ | ✓ | ||
Editing Time | ✓ | ✓ | ✓ | ✓ |
File Application | ✓ | ✓ | ✓ | ✓ |
File Type | ✓ | ✓ | ✓ | ✓ |
Finish Date | ✓ | ✓ | ✓ | ✓ |
Fiscal Year Start | ✓ | ✓ | ✓ | ✓ |
Fiscal Year Start Month | ✓ | ✓ | ✓ | ✓ |
Full Application Name | ✓ | ✓ | ✓ | ✓ |
GUID | ✓ | ✓ | ✓ | ✓ |
Honor Constraints | ✓ | ✓ | ✓ | ✓ |
Hyperlink Base | ✓ | ✓ | ✓ | ✓ |
Keywords | ✓ | ✓ | ✓ | ✓ |
Language | ✓ | ✓ | ✓ | |
Last Author | ✓ | ✓ | ✓ | ✓ |
Last Printed | ✓ | ✓ | ✓ | ✓ |
Last Saved | ✓ | ✓ | ✓ | ✓ |
Level All Resources | ✓ | ✓ | ✓ | ✓ |
Leveling Priorities | ✓ | ✓ | ✓ | ✓ |
Limit Number of Float Paths to Calculate | ✓ | ✓ | ✓ | ✓ |
MPP File Type | ✓ | ✓ | ✓ | ✓ |
MPX Code Page | ✓ | ✓ | ✓ | ✓ |
MPX Delimiter | ✓ | ✓ | ✓ | ✓ |
MPX File Version | ✓ | ✓ | ✓ | ✓ |
MPX Program Name | ✓ | ✓ | ✓ | ✓ |
Manager | ✓ | ✓ | ✓ | ✓ |
Maximum Percentage to Overallocate Resources | ✓ | ✓ | ✓ | ✓ |
Microsoft Project Server URL | ✓ | ✓ | ✓ | ✓ |
Minutes per Day | ✓ | ✓ | ✓ | ✓ |
Minutes per Month | ✓ | ✓ | ✓ | ✓ |
Minutes per Week | ✓ | ✓ | ✓ | ✓ |
Minutes per Year | ✓ | ✓ | ✓ | ✓ |
Multiple Critical Paths | ✓ | ✓ | ✓ | |
New Task Start Is Project Start | ✓ | ✓ | ✓ | ✓ |
New Tasks Are Manual | ✓ | ✓ | ✓ | |
New Tasks Estimated | ✓ | ✓ | ✓ | ✓ |
Number of Float Paths to Calculate | ✓ | ✓ | ✓ | ✓ |
PM Text | ✓ | ✓ | ✓ | ✓ |
Presentation Format | ✓ | ✓ | ✓ | |
Preserve Minimum Float When Leveling | ✓ | ✓ | ✓ | ✓ |
Preserve Scheduled Early and Late Dates | ✓ | ✓ | ✓ | ✓ |
Project File Path | ✓ | ✓ | ✓ | |
Project Title | ✓ | ✓ | ✓ | ✓ |
Relationship Lag Calendar | ✓ | ✓ | ✓ | ✓ |
Resource Pool File | ✓ | ✓ | ✓ | |
Revision | ✓ | ✓ | ✓ | ✓ |
Schedule From | ✓ | ✓ | ✓ | ✓ |
Short Application Name | ✓ | ✓ | ✓ | ✓ |
Show Project Summary Task | ✓ | ✓ | ✓ | ✓ |
Split In Progress Tasks | ✓ | ✓ | ✓ | ✓ |
Start Date | ✓ | ✓ | ✓ | ✓ |
Status Date | ✓ | ✓ | ✓ | |
Subject | ✓ | ✓ | ✓ | ✓ |
Template | ✓ | ✓ | ✓ | ✓ |
Thousands Separator | ✓ | ✓ | ✓ | ✓ |
Time Format | ✓ | ✓ | ✓ | ✓ |
Time Separator | ✓ | ✓ | ✓ | ✓ |
Total Slack Calculation Type | ✓ | ✓ | ✓ | ✓ |
Updating Task Status Updates Resource Status | ✓ | ✓ | ✓ | ✓ |
Use Expected Finish Dates | ✓ | ✓ | ✓ | ✓ |
WBS Code Separator | ✓ | ✓ | ✓ | ✓ |
Week Start Day | ✓ | ✓ | ✓ | ✓ |
When Scheduling Progressed Activities Use | ✓ | ✓ | ✓ | ✓ |
Baseline Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Baseline1 Date | ✓ | ✓ | ✓ | |
Baseline2 Date | ✓ | ✓ | ||
Baseline3 Date | ✓ | ✓ | ||
Baseline4 Date | ✓ | ✓ | ||
Baseline5 Date | ✓ | ✓ | ||
Baseline6 Date | ✓ | ✓ | ||
Baseline7 Date | ✓ | ✓ | ||
Baseline8 Date | ✓ | ✓ | ||
Baseline9 Date | ✓ | ✓ | ||
Baseline10 Date | ✓ | ✓ | ||
Baseline Calendar Name | ✓ | ✓ | ✓ | ✓ |
Baseline Date | ✓ | ✓ | ✓ |
Task
Core Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
% Complete | ✓ | ✓ | ✓ | ✓ |
% Work Complete | ✓ | ✓ | ✓ | ✓ |
Active | ✓ | ✓ | ✓ | ✓ |
Activity Percent Complete | ✓ | ✓ | ✓ | ✓ |
Actual Cost | ✓ | ✓ | ✓ | ✓ |
Actual Duration | ✓ | ✓ | ✓ | ✓ |
Actual Duration Units | ✓ | ✓ | ✓ | |
Actual Finish | ✓ | ✓ | ✓ | ✓ |
Actual Overtime Cost | ✓ | ✓ | ✓ | ✓ |
Actual Overtime Work | ✓ | ✓ | ✓ | ✓ |
Actual Start | ✓ | ✓ | ✓ | ✓ |
Actual Work | ✓ | ✓ | ✓ | ✓ |
Actual Work Protected | ✓ | |||
Board Status ID | ✓ | |||
Budget Cost | ✓ | ✓ | ✓ | |
Budget Work | ✓ | ✓ | ✓ | |
Calendar Unique ID | ✓ | ✓ | ✓ | |
Complete Through | ✓ | ✓ | ✓ | ✓ |
Constraint Date | ✓ | ✓ | ✓ | ✓ |
Constraint Type | ✓ | ✓ | ✓ | ✓ |
Contact | ✓ | ✓ | ✓ | |
Cost | ✓ | ✓ | ✓ | ✓ |
Cost Variance | ✓ | ✓ | ✓ | ✓ |
Created | ✓ | ✓ | ✓ | ✓ |
Critical | ✓ | ✓ | ✓ | ✓ |
Deadline | ✓ | ✓ | ✓ | |
Duration | ✓ | ✓ | ✓ | ✓ |
Duration Units | ✓ | ✓ | ✓ | |
Duration Variance | ✓ | ✓ | ✓ | ✓ |
Early Finish | ✓ | ✓ | ✓ | ✓ |
Early Start | ✓ | ✓ | ✓ | ✓ |
Earned Value Method | ✓ | ✓ | ||
Effort Driven | ✓ | ✓ | ✓ | ✓ |
Estimated | ✓ | ✓ | ✓ | |
Expanded | ✓ | ✓ | ✓ | ✓ |
External Project | ✓ | ✓ | ✓ | |
External Task | ✓ | ✓ | ✓ | |
Finish | ✓ | ✓ | ✓ | ✓ |
Finish Slack | ✓ | ✓ | ✓ | ✓ |
Finish Variance | ✓ | ✓ | ✓ | ✓ |
Fixed Cost | ✓ | ✓ | ✓ | ✓ |
Fixed Cost Accrual | ✓ | ✓ | ✓ | ✓ |
Free Slack | ✓ | ✓ | ✓ | |
GUID | ✓ | ✓ | ||
Hide Bar | ✓ | ✓ | ✓ | ✓ |
Hyperlink | ✓ | ✓ | ✓ | ✓ |
Hyperlink Address | ✓ | ✓ | ✓ | ✓ |
Hyperlink Data | ✓ | ✓ | ✓ | |
Hyperlink Screen Tip | ✓ | ✓ | ✓ | |
Hyperlink SubAddress | ✓ | ✓ | ✓ | ✓ |
ID | ✓ | ✓ | ✓ | ✓ |
Ignore Resource Calendar | ✓ | ✓ | ✓ | |
Late Finish | ✓ | ✓ | ✓ | ✓ |
Late Start | ✓ | ✓ | ✓ | ✓ |
Level Assignments | ✓ | ✓ | ✓ | ✓ |
Leveling Can Split | ✓ | ✓ | ✓ | ✓ |
Leveling Delay | ✓ | ✓ | ✓ | ✓ |
Leveling Delay Units | ✓ | ✓ | ✓ | |
Manual Duration | ✓ | |||
Manual Duration Units | ✓ | |||
Marked | ✓ | ✓ | ✓ | |
Milestone | ✓ | ✓ | ✓ | ✓ |
Notes | ✓ | ✓ | ✓ | ✓ |
Null | ✓ | ✓ | ✓ | |
Outline Level | ✓ | ✓ | ✓ | ✓ |
Outline Number | ✓ | ✓ | ✓ | ✓ |
Overtime Cost | ✓ | ✓ | ✓ | ✓ |
Parent Task Unique ID | ✓ | ✓ | ✓ | |
Physical % Complete | ✓ | ✓ | ✓ | |
Preleveled Finish | ✓ | ✓ | ✓ | ✓ |
Preleveled Start | ✓ | ✓ | ✓ | ✓ |
Priority | ✓ | ✓ | ✓ | ✓ |
Project | ✓ | ✓ | ✓ | |
Recalc Outline Codes | ✓ | ✓ | ||
Recurring | ✓ | ✓ | ✓ | ✓ |
Recurring Data | ✓ | ✓ | ✓ | |
Remaining Cost | ✓ | ✓ | ✓ | ✓ |
Remaining Duration | ✓ | ✓ | ✓ | ✓ |
Remaining Overtime Cost | ✓ | ✓ | ✓ | ✓ |
Remaining Overtime Work | ✓ | ✓ | ✓ | ✓ |
Remaining Work | ✓ | ✓ | ✓ | ✓ |
Resume | ✓ | ✓ | ✓ | ✓ |
Resume No Earlier Than | ✓ | ✓ | ✓ | |
Rollup | ✓ | ✓ | ✓ | ✓ |
Scheduled Duration | ✓ | |||
Scheduled Finish | ✓ | |||
Scheduled Start | ✓ | |||
Show Duration Text | ✓ | |||
Show Finish Text | ✓ | |||
Show Start Text | ✓ | |||
Splits | ✓ | ✓ | ✓ | |
Sprint ID | ✓ | |||
Start | ✓ | ✓ | ✓ | ✓ |
Start Slack | ✓ | ✓ | ✓ | ✓ |
Start Variance | ✓ | ✓ | ✓ | ✓ |
Stop | ✓ | ✓ | ✓ | ✓ |
Subproject File | ✓ | ✓ | ✓ | |
Subproject GUID | ✓ | ✓ | ||
Subproject Task ID | ✓ | ✓ | ✓ | |
Subproject Task Unique ID | ✓ | ✓ | ✓ | |
Subproject Tasks Unique ID Offset | ✓ | ✓ | ✓ | |
Summary | ✓ | ✓ | ✓ | ✓ |
Summary Progress | ✓ | ✓ | ✓ | |
Task Calendar GUID | ✓ | ✓ | ||
Task Mode | ✓ | |||
Task Name | ✓ | ✓ | ✓ | ✓ |
Total Slack | ✓ | ✓ | ✓ | ✓ |
Type | ✓ | ✓ | ✓ | ✓ |
Unique ID | ✓ | ✓ | ✓ | ✓ |
WBS | ✓ | ✓ | ✓ | ✓ |
Work | ✓ | ✓ | ✓ | ✓ |
Work Variance | ✓ | ✓ | ✓ | ✓ |
Baseline Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Baseline1 Cost | ✓ | ✓ | ✓ | |
Baseline1 Duration | ✓ | ✓ | ✓ | |
Baseline1 Duration Units | ✓ | ✓ | ||
Baseline1 Estimated Duration | ✓ | |||
Baseline1 Estimated Finish | ✓ | |||
Baseline1 Estimated Start | ✓ | |||
Baseline1 Finish | ✓ | ✓ | ✓ | |
Baseline1 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline1 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline1 Start | ✓ | ✓ | ✓ | |
Baseline1 Work | ✓ | ✓ | ✓ | |
Baseline2 Cost | ✓ | ✓ | ✓ | |
Baseline2 Duration | ✓ | ✓ | ✓ | |
Baseline2 Duration Units | ✓ | ✓ | ||
Baseline2 Estimated Duration | ✓ | |||
Baseline2 Estimated Finish | ✓ | |||
Baseline2 Estimated Start | ✓ | |||
Baseline2 Finish | ✓ | ✓ | ✓ | |
Baseline2 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline2 Fixed Cost Accrual | ✓ | |||
Baseline2 Start | ✓ | ✓ | ✓ | |
Baseline2 Work | ✓ | ✓ | ✓ | |
Baseline3 Cost | ✓ | ✓ | ✓ | |
Baseline3 Duration | ✓ | ✓ | ✓ | |
Baseline3 Duration Units | ✓ | ✓ | ||
Baseline3 Estimated Duration | ✓ | |||
Baseline3 Estimated Finish | ✓ | |||
Baseline3 Estimated Start | ✓ | |||
Baseline3 Finish | ✓ | ✓ | ✓ | |
Baseline3 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline3 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline3 Start | ✓ | ✓ | ✓ | |
Baseline3 Work | ✓ | ✓ | ✓ | |
Baseline4 Cost | ✓ | ✓ | ✓ | |
Baseline4 Duration | ✓ | ✓ | ✓ | |
Baseline4 Duration Units | ✓ | ✓ | ||
Baseline4 Estimated Duration | ✓ | |||
Baseline4 Estimated Finish | ✓ | |||
Baseline4 Estimated Start | ✓ | |||
Baseline4 Finish | ✓ | ✓ | ✓ | |
Baseline4 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline4 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline4 Start | ✓ | ✓ | ✓ | |
Baseline4 Work | ✓ | ✓ | ✓ | |
Baseline5 Cost | ✓ | ✓ | ✓ | |
Baseline5 Duration | ✓ | ✓ | ✓ | |
Baseline5 Duration Units | ✓ | ✓ | ||
Baseline5 Estimated Duration | ✓ | |||
Baseline5 Estimated Finish | ✓ | |||
Baseline5 Estimated Start | ✓ | |||
Baseline5 Finish | ✓ | ✓ | ✓ | |
Baseline5 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline5 Fixed Cost Accrual | ✓ | |||
Baseline5 Start | ✓ | ✓ | ✓ | |
Baseline5 Work | ✓ | ✓ | ✓ | |
Baseline6 Cost | ✓ | ✓ | ✓ | |
Baseline6 Duration | ✓ | ✓ | ✓ | |
Baseline6 Duration Units | ✓ | ✓ | ||
Baseline6 Estimated Duration | ✓ | |||
Baseline6 Estimated Finish | ✓ | |||
Baseline6 Estimated Start | ✓ | |||
Baseline6 Finish | ✓ | ✓ | ✓ | |
Baseline6 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline6 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline6 Start | ✓ | ✓ | ✓ | |
Baseline6 Work | ✓ | ✓ | ✓ | |
Baseline7 Cost | ✓ | ✓ | ✓ | |
Baseline7 Duration | ✓ | ✓ | ✓ | |
Baseline7 Duration Units | ✓ | ✓ | ||
Baseline7 Estimated Duration | ✓ | |||
Baseline7 Estimated Finish | ✓ | |||
Baseline7 Estimated Start | ✓ | |||
Baseline7 Finish | ✓ | ✓ | ✓ | |
Baseline7 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline7 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline7 Start | ✓ | ✓ | ✓ | |
Baseline7 Work | ✓ | ✓ | ✓ | |
Baseline8 Cost | ✓ | ✓ | ✓ | |
Baseline8 Duration | ✓ | ✓ | ✓ | |
Baseline8 Duration Units | ✓ | ✓ | ||
Baseline8 Estimated Duration | ✓ | |||
Baseline8 Estimated Finish | ✓ | |||
Baseline8 Estimated Start | ✓ | |||
Baseline8 Finish | ✓ | ✓ | ✓ | |
Baseline8 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline8 Fixed Cost Accrual | ✓ | |||
Baseline8 Start | ✓ | ✓ | ✓ | |
Baseline8 Work | ✓ | ✓ | ✓ | |
Baseline9 Cost | ✓ | ✓ | ✓ | |
Baseline9 Duration | ✓ | ✓ | ✓ | |
Baseline9 Duration Units | ✓ | ✓ | ||
Baseline9 Estimated Duration | ✓ | |||
Baseline9 Estimated Finish | ✓ | |||
Baseline9 Estimated Start | ✓ | |||
Baseline9 Finish | ✓ | ✓ | ✓ | |
Baseline9 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline9 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline9 Start | ✓ | ✓ | ✓ | |
Baseline9 Work | ✓ | ✓ | ✓ | |
Baseline10 Cost | ✓ | ✓ | ✓ | |
Baseline10 Deliverable Finish | ✓ | |||
Baseline10 Duration | ✓ | ✓ | ✓ | |
Baseline10 Duration Units | ✓ | ✓ | ||
Baseline10 Estimated Duration | ✓ | |||
Baseline10 Estimated Finish | ✓ | |||
Baseline10 Estimated Start | ✓ | |||
Baseline10 Finish | ✓ | ✓ | ✓ | |
Baseline10 Fixed Cost | ✓ | ✓ | ✓ | |
Baseline10 Fixed Cost Accrual | ✓ | ✓ | ||
Baseline10 Start | ✓ | ✓ | ✓ | |
Baseline10 Work | ✓ | ✓ | ✓ | |
Baseline Budget Cost | ✓ | |||
Baseline Budget Work | ✓ | |||
Baseline Cost | ✓ | ✓ | ✓ | ✓ |
Baseline Deliverable Finish | ✓ | |||
Baseline Deliverable Start | ✓ | |||
Baseline Duration | ✓ | ✓ | ✓ | ✓ |
Baseline Duration Units | ✓ | ✓ | ✓ | |
Baseline Estimated Duration | ✓ | |||
Baseline Estimated Finish | ✓ | |||
Baseline Estimated Start | ✓ | |||
Baseline Finish | ✓ | ✓ | ✓ | ✓ |
Baseline Fixed Cost | ✓ | ✓ | ✓ | |
Baseline Fixed Cost Accrual | ✓ | ✓ | ||
Baseline Start | ✓ | ✓ | ✓ | ✓ |
Baseline Work | ✓ | ✓ | ✓ | ✓ |
Custom Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Cost1 | ✓ | ✓ | ✓ | |
Cost2 | ✓ | ✓ | ✓ | |
Cost3 | ✓ | ✓ | ✓ | |
Cost4 | ✓ | ✓ | ✓ | |
Cost5 | ✓ | ✓ | ✓ | |
Cost6 | ✓ | ✓ | ✓ | |
Cost7 | ✓ | ✓ | ✓ | |
Cost8 | ✓ | ✓ | ✓ | |
Cost9 | ✓ | ✓ | ✓ | |
Cost10 | ✓ | ✓ | ✓ | |
Date1 | ✓ | ✓ | ✓ | ✓ |
Date2 | ✓ | ✓ | ✓ | ✓ |
Date3 | ✓ | ✓ | ✓ | ✓ |
Date4 | ✓ | ✓ | ✓ | ✓ |
Date5 | ✓ | ✓ | ✓ | ✓ |
Date6 | ✓ | ✓ | ✓ | ✓ |
Date7 | ✓ | ✓ | ✓ | ✓ |
Date8 | ✓ | ✓ | ✓ | ✓ |
Date9 | ✓ | ✓ | ✓ | ✓ |
Date10 | ✓ | ✓ | ✓ | ✓ |
Duration1 | ✓ | ✓ | ✓ | ✓ |
Duration1 Units | ✓ | ✓ | ✓ | |
Duration2 | ✓ | ✓ | ✓ | ✓ |
Duration2 Units | ✓ | ✓ | ✓ | |
Duration3 | ✓ | ✓ | ✓ | ✓ |
Duration3 Units | ✓ | ✓ | ✓ | |
Duration4 | ✓ | ✓ | ✓ | ✓ |
Duration4 Units | ✓ | ✓ | ✓ | |
Duration5 | ✓ | ✓ | ✓ | ✓ |
Duration5 Units | ✓ | ✓ | ✓ | |
Duration6 | ✓ | ✓ | ✓ | ✓ |
Duration6 Units | ✓ | ✓ | ✓ | |
Duration7 | ✓ | ✓ | ✓ | ✓ |
Duration7 Units | ✓ | ✓ | ✓ | |
Duration8 | ✓ | ✓ | ✓ | ✓ |
Duration8 Units | ✓ | ✓ | ✓ | |
Duration9 | ✓ | ✓ | ✓ | ✓ |
Duration9 Units | ✓ | ✓ | ✓ | |
Duration10 | ✓ | ✓ | ✓ | ✓ |
Duration10 Units | ✓ | ✓ | ✓ | |
Finish1 | ✓ | ✓ | ✓ | ✓ |
Finish2 | ✓ | ✓ | ✓ | ✓ |
Finish3 | ✓ | ✓ | ✓ | ✓ |
Finish4 | ✓ | ✓ | ✓ | ✓ |
Finish5 | ✓ | ✓ | ✓ | ✓ |
Finish6 | ✓ | ✓ | ✓ | ✓ |
Finish7 | ✓ | ✓ | ✓ | ✓ |
Finish8 | ✓ | ✓ | ✓ | ✓ |
Finish9 | ✓ | ✓ | ✓ | ✓ |
Finish10 | ✓ | ✓ | ✓ | ✓ |
Flag1 | ✓ | ✓ | ✓ | ✓ |
Flag2 | ✓ | ✓ | ✓ | ✓ |
Flag3 | ✓ | ✓ | ✓ | ✓ |
Flag4 | ✓ | ✓ | ✓ | ✓ |
Flag5 | ✓ | ✓ | ✓ | ✓ |
Flag6 | ✓ | ✓ | ✓ | ✓ |
Flag7 | ✓ | ✓ | ✓ | ✓ |
Flag8 | ✓ | ✓ | ✓ | ✓ |
Flag9 | ✓ | ✓ | ✓ | ✓ |
Flag10 | ✓ | ✓ | ✓ | ✓ |
Flag11 | ✓ | ✓ | ✓ | ✓ |
Flag12 | ✓ | ✓ | ✓ | ✓ |
Flag13 | ✓ | ✓ | ✓ | ✓ |
Flag14 | ✓ | ✓ | ✓ | ✓ |
Flag15 | ✓ | ✓ | ✓ | ✓ |
Flag16 | ✓ | ✓ | ✓ | ✓ |
Flag17 | ✓ | ✓ | ✓ | ✓ |
Flag18 | ✓ | ✓ | ✓ | ✓ |
Flag19 | ✓ | ✓ | ✓ | ✓ |
Flag20 | ✓ | ✓ | ✓ | ✓ |
Number1 | ✓ | ✓ | ✓ | ✓ |
Number2 | ✓ | ✓ | ✓ | ✓ |
Number3 | ✓ | ✓ | ✓ | ✓ |
Number4 | ✓ | ✓ | ✓ | ✓ |
Number5 | ✓ | ✓ | ✓ | ✓ |
Number6 | ✓ | ✓ | ✓ | ✓ |
Number7 | ✓ | ✓ | ✓ | ✓ |
Number8 | ✓ | ✓ | ✓ | ✓ |
Number9 | ✓ | ✓ | ✓ | ✓ |
Number10 | ✓ | ✓ | ✓ | ✓ |
Number11 | ✓ | ✓ | ✓ | ✓ |
Number12 | ✓ | ✓ | ✓ | ✓ |
Number13 | ✓ | ✓ | ✓ | ✓ |
Number14 | ✓ | ✓ | ✓ | ✓ |
Number15 | ✓ | ✓ | ✓ | ✓ |
Number16 | ✓ | ✓ | ✓ | ✓ |
Number17 | ✓ | ✓ | ✓ | ✓ |
Number18 | ✓ | ✓ | ✓ | ✓ |
Number19 | ✓ | ✓ | ✓ | ✓ |
Number20 | ✓ | ✓ | ✓ | ✓ |
Outline Code1 | ✓ | ✓ | ✓ | |
Outline Code1 Index | ✓ | ✓ | ✓ | |
Outline Code2 | ✓ | ✓ | ✓ | |
Outline Code2 Index | ✓ | ✓ | ✓ | |
Outline Code3 | ✓ | ✓ | ✓ | |
Outline Code3 Index | ✓ | ✓ | ✓ | |
Outline Code4 | ✓ | ✓ | ✓ | |
Outline Code4 Index | ✓ | ✓ | ✓ | |
Outline Code5 | ✓ | ✓ | ✓ | |
Outline Code5 Index | ✓ | ✓ | ✓ | |
Outline Code6 | ✓ | ✓ | ✓ | |
Outline Code6 Index | ✓ | ✓ | ✓ | |
Outline Code7 | ✓ | ✓ | ✓ | |
Outline Code7 Index | ✓ | ✓ | ✓ | |
Outline Code8 | ✓ | ✓ | ✓ | |
Outline Code8 Index | ✓ | ✓ | ✓ | |
Outline Code9 | ✓ | ✓ | ✓ | |
Outline Code9 Index | ✓ | ✓ | ✓ | |
Outline Code10 | ✓ | ✓ | ✓ | |
Outline Code10 Index | ✓ | ✓ | ✓ | |
Start1 | ✓ | ✓ | ✓ | ✓ |
Start2 | ✓ | ✓ | ✓ | ✓ |
Start3 | ✓ | ✓ | ✓ | ✓ |
Start4 | ✓ | ✓ | ✓ | ✓ |
Start5 | ✓ | ✓ | ✓ | ✓ |
Start6 | ✓ | ✓ | ✓ | ✓ |
Start7 | ✓ | ✓ | ✓ | ✓ |
Start8 | ✓ | ✓ | ✓ | ✓ |
Start9 | ✓ | ✓ | ✓ | ✓ |
Start10 | ✓ | ✓ | ✓ | ✓ |
Text1 | ✓ | ✓ | ✓ | ✓ |
Text2 | ✓ | ✓ | ✓ | ✓ |
Text3 | ✓ | ✓ | ✓ | ✓ |
Text4 | ✓ | ✓ | ✓ | ✓ |
Text5 | ✓ | ✓ | ✓ | ✓ |
Text6 | ✓ | ✓ | ✓ | |
Text7 | ✓ | ✓ | ✓ | |
Text8 | ✓ | ✓ | ✓ | |
Text9 | ✓ | ✓ | ✓ | |
Text10 | ✓ | ✓ | ✓ | |
Text11 | ✓ | ✓ | ✓ | |
Text12 | ✓ | ✓ | ✓ | |
Text13 | ✓ | ✓ | ✓ | |
Text14 | ✓ | ✓ | ✓ | |
Text15 | ✓ | ✓ | ✓ | |
Text16 | ✓ | ✓ | ✓ | |
Text17 | ✓ | ✓ | ✓ | |
Text18 | ✓ | ✓ | ✓ | |
Text19 | ✓ | ✓ | ✓ | |
Text20 | ✓ | ✓ | ✓ | |
Text21 | ✓ | ✓ | ✓ | |
Text22 | ✓ | ✓ | ✓ | |
Text23 | ✓ | ✓ | ✓ | |
Text24 | ✓ | ✓ | ✓ | |
Text25 | ✓ | ✓ | ✓ | |
Text26 | ✓ | ✓ | ✓ | |
Text27 | ✓ | ✓ | ✓ | |
Text28 | ✓ | ✓ | ✓ | |
Text29 | ✓ | ✓ | ✓ | |
Text30 | ✓ | ✓ | ✓ |
Enterprise Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Enterprise Data | ✓ | |||
Enterprise Duration1 Units | ✓ | ✓ | ||
Enterprise Duration2 Units | ✓ | ✓ | ||
Enterprise Duration3 Units | ✓ | ✓ | ||
Enterprise Duration4 Units | ✓ | ✓ | ||
Enterprise Duration5 Units | ✓ | ✓ | ||
Enterprise Duration6 Units | ✓ | ✓ | ||
Enterprise Duration7 Units | ✓ | ✓ | ||
Enterprise Duration8 Units | ✓ | ✓ | ||
Enterprise Duration9 Units | ✓ | ✓ | ||
Enterprise Duration10 Units | ✓ | ✓ | ||
Enterprise Project Date1 | ✓ | |||
Enterprise Project Date2 | ✓ | |||
Enterprise Project Date3 | ✓ | |||
Enterprise Project Date4 | ✓ | |||
Enterprise Project Number2 | ✓ | |||
Enterprise Project Number4 | ✓ | |||
Enterprise Project Number5 | ✓ | |||
Enterprise Project Number22 | ✓ | |||
Enterprise Project Text1 | ✓ | ✓ | ✓ | |
Enterprise Project Text2 | ✓ | ✓ | ||
Enterprise Project Text3 | ✓ | ✓ | ||
Enterprise Project Text4 | ✓ | ✓ | ||
Enterprise Project Text5 | ✓ | |||
Enterprise Project Text6 | ✓ | ✓ | ||
Enterprise Project Text8 | ✓ | |||
Enterprise Project Text9 | ✓ | |||
Enterprise Project Text10 | ✓ | |||
Enterprise Project Text11 | ✓ | |||
Enterprise Project Text12 | ✓ | |||
Enterprise Project Text13 | ✓ | |||
Enterprise Project Text14 | ✓ | |||
Enterprise Project Text15 | ✓ | |||
Enterprise Project Text16 | ✓ | |||
Enterprise Project Text17 | ✓ | |||
Enterprise Project Text18 | ✓ | |||
Enterprise Project Text19 | ✓ | |||
Enterprise Project Text21 | ✓ | |||
Enterprise Project Text40 | ✓ | ✓ | ✓ |
Resource
Core Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Accrue At | ✓ | ✓ | ✓ | ✓ |
Active | ✓ | ✓ | ✓ | ✓ |
Actual Cost | ✓ | ✓ | ✓ | |
Actual Overtime Cost | ✓ | ✓ | ✓ | |
Actual Overtime Work | ✓ | ✓ | ✓ | |
Actual Work | ✓ | ✓ | ✓ | ✓ |
Actual Work Protected | ✓ | |||
Availability Data | ✓ | ✓ | ✓ | |
Available From | ✓ | ✓ | ✓ | |
Available To | ✓ | ✓ | ✓ | |
Booking Type | ✓ | ✓ | ||
Budget | ✓ | ✓ | ||
Budget Cost | ✓ | ✓ | ✓ | |
Budget Work | ✓ | ✓ | ||
Calculate Costs From Units | ✓ | ✓ | ✓ | ✓ |
Calendar GUID | ✓ | ✓ | ||
Calendar Unique ID | ✓ | ✓ | ✓ | ✓ |
Code | ✓ | ✓ | ✓ | |
Cost | ✓ | ✓ | ✓ | ✓ |
Cost Center | ✓ | |||
Cost Per Use | ✓ | ✓ | ✓ | |
Cost Rate A | ✓ | ✓ | ✓ | |
Cost Rate B | ✓ | ✓ | ✓ | |
Cost Rate C | ✓ | ✓ | ✓ | |
Cost Rate D | ✓ | ✓ | ✓ | |
Cost Rate E | ✓ | ✓ | ✓ | |
Cost Variance | ✓ | ✓ | ✓ | ✓ |
Created | ✓ | ✓ | ✓ | |
Default Units | ✓ | ✓ | ✓ | ✓ |
Email Address | ✓ | ✓ | ✓ | |
GUID | ✓ | ✓ | ||
Generic | ✓ | ✓ | ✓ | |
Group | ✓ | ✓ | ✓ | ✓ |
Hyperlink | ✓ | ✓ | ✓ | |
Hyperlink Address | ✓ | ✓ | ✓ | |
Hyperlink Data | ✓ | ✓ | ✓ | |
Hyperlink Screen Tip | ✓ | ✓ | ✓ | |
Hyperlink SubAddress | ✓ | ✓ | ✓ | |
ID | ✓ | ✓ | ✓ | ✓ |
Initials | ✓ | ✓ | ✓ | ✓ |
Material Label | ✓ | ✓ | ✓ | |
Max Units | ✓ | ✓ | ✓ | |
Name | ✓ | ✓ | ✓ | ✓ |
Notes | ✓ | ✓ | ✓ | ✓ |
Overallocated | ✓ | ✓ | ✓ | ✓ |
Overtime Cost | ✓ | ✓ | ✓ | |
Overtime Rate | ✓ | ✓ | ✓ | |
Overtime Rate Units | ✓ | ✓ | ✓ | |
Overtime Work | ✓ | ✓ | ✓ | |
Peak | ✓ | ✓ | ✓ | ✓ |
Phonetics | ✓ | |||
Regular Work | ✓ | ✓ | ✓ | ✓ |
Remaining Cost | ✓ | ✓ | ✓ | ✓ |
Remaining Overtime Cost | ✓ | ✓ | ✓ | |
Remaining Overtime Work | ✓ | ✓ | ✓ | |
Remaining Work | ✓ | ✓ | ✓ | ✓ |
Standard Rate | ✓ | ✓ | ✓ | |
Standard Rate Units | ✓ | ✓ | ✓ | |
Subproject Unique Resource ID | ✓ | ✓ | ||
Type | ✓ | ✓ | ✓ | ✓ |
Unique ID | ✓ | ✓ | ✓ | ✓ |
Unit of Measure Unique ID | ✓ | ✓ | ✓ | |
Windows User Account | ✓ | ✓ | ✓ | |
Work | ✓ | ✓ | ✓ | ✓ |
Work Variance | ✓ | ✓ | ✓ | ✓ |
Workgroup | ✓ | ✓ | ✓ |
Baseline Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Baseline1 Budget Cost | ✓ | |||
Baseline1 Budget Work | ✓ | |||
Baseline1 Cost | ✓ | ✓ | ✓ | |
Baseline1 Work | ✓ | ✓ | ✓ | |
Baseline2 Budget Cost | ✓ | |||
Baseline2 Budget Work | ✓ | |||
Baseline2 Cost | ✓ | ✓ | ✓ | |
Baseline2 Work | ✓ | ✓ | ✓ | |
Baseline3 Budget Cost | ✓ | |||
Baseline3 Budget Work | ✓ | |||
Baseline3 Cost | ✓ | ✓ | ✓ | |
Baseline3 Work | ✓ | ✓ | ✓ | |
Baseline4 Budget Cost | ✓ | |||
Baseline4 Budget Work | ✓ | |||
Baseline4 Cost | ✓ | ✓ | ✓ | |
Baseline4 Work | ✓ | ✓ | ✓ | |
Baseline5 Budget Cost | ✓ | |||
Baseline5 Budget Work | ✓ | |||
Baseline5 Cost | ✓ | ✓ | ✓ | |
Baseline5 Work | ✓ | ✓ | ✓ | |
Baseline6 Budget Cost | ✓ | |||
Baseline6 Budget Work | ✓ | |||
Baseline6 Cost | ✓ | ✓ | ✓ | |
Baseline6 Work | ✓ | ✓ | ✓ | |
Baseline7 Budget Cost | ✓ | |||
Baseline7 Budget Work | ✓ | |||
Baseline7 Cost | ✓ | ✓ | ✓ | |
Baseline7 Work | ✓ | ✓ | ✓ | |
Baseline8 Budget Cost | ✓ | |||
Baseline8 Budget Work | ✓ | |||
Baseline8 Cost | ✓ | ✓ | ✓ | |
Baseline8 Work | ✓ | ✓ | ✓ | |
Baseline9 Budget Cost | ✓ | |||
Baseline9 Budget Work | ✓ | |||
Baseline9 Cost | ✓ | ✓ | ✓ | |
Baseline9 Work | ✓ | ✓ | ✓ | |
Baseline10 Budget Cost | ✓ | |||
Baseline10 Budget Work | ✓ | |||
Baseline10 Cost | ✓ | ✓ | ✓ | |
Baseline10 Work | ✓ | ✓ | ✓ | |
Baseline Budget Cost | ✓ | |||
Baseline Budget Work | ✓ | |||
Baseline Cost | ✓ | ✓ | ✓ | |
Baseline Work | ✓ | ✓ | ✓ | ✓ |
Custom Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Cost1 | ✓ | ✓ | ✓ | |
Cost2 | ✓ | ✓ | ✓ | |
Cost3 | ✓ | ✓ | ✓ | |
Cost4 | ✓ | ✓ | ✓ | |
Cost5 | ✓ | ✓ | ✓ | |
Cost6 | ✓ | ✓ | ✓ | |
Cost7 | ✓ | ✓ | ✓ | |
Cost8 | ✓ | ✓ | ✓ | |
Cost9 | ✓ | ✓ | ✓ | |
Cost10 | ✓ | ✓ | ✓ | |
Date1 | ✓ | ✓ | ✓ | |
Date2 | ✓ | ✓ | ✓ | |
Date3 | ✓ | ✓ | ✓ | |
Date4 | ✓ | ✓ | ✓ | |
Date5 | ✓ | ✓ | ✓ | |
Date6 | ✓ | ✓ | ✓ | |
Date7 | ✓ | ✓ | ✓ | |
Date8 | ✓ | ✓ | ✓ | |
Date9 | ✓ | ✓ | ✓ | |
Date10 | ✓ | ✓ | ✓ | |
Duration1 | ✓ | ✓ | ✓ | |
Duration1 Units | ✓ | ✓ | ✓ | |
Duration2 | ✓ | ✓ | ✓ | |
Duration2 Units | ✓ | ✓ | ✓ | |
Duration3 | ✓ | ✓ | ✓ | |
Duration3 Units | ✓ | ✓ | ✓ | |
Duration4 | ✓ | ✓ | ✓ | |
Duration4 Units | ✓ | ✓ | ✓ | |
Duration5 | ✓ | ✓ | ✓ | |
Duration5 Units | ✓ | ✓ | ✓ | |
Duration6 | ✓ | ✓ | ✓ | |
Duration6 Units | ✓ | ✓ | ✓ | |
Duration7 | ✓ | ✓ | ✓ | |
Duration7 Units | ✓ | ✓ | ✓ | |
Duration8 | ✓ | ✓ | ✓ | |
Duration8 Units | ✓ | ✓ | ✓ | |
Duration9 | ✓ | ✓ | ✓ | |
Duration9 Units | ✓ | ✓ | ✓ | |
Duration10 | ✓ | ✓ | ✓ | |
Duration10 Units | ✓ | ✓ | ✓ | |
Finish1 | ✓ | ✓ | ✓ | |
Finish2 | ✓ | ✓ | ✓ | |
Finish3 | ✓ | ✓ | ✓ | |
Finish4 | ✓ | ✓ | ✓ | |
Finish5 | ✓ | ✓ | ✓ | |
Finish6 | ✓ | ✓ | ✓ | |
Finish7 | ✓ | ✓ | ✓ | |
Finish8 | ✓ | ✓ | ✓ | |
Finish9 | ✓ | ✓ | ✓ | |
Finish10 | ✓ | ✓ | ✓ | |
Flag1 | ✓ | ✓ | ✓ | |
Flag2 | ✓ | ✓ | ✓ | |
Flag3 | ✓ | ✓ | ✓ | |
Flag4 | ✓ | ✓ | ✓ | |
Flag5 | ✓ | ✓ | ✓ | |
Flag6 | ✓ | ✓ | ✓ | |
Flag7 | ✓ | ✓ | ✓ | |
Flag8 | ✓ | ✓ | ✓ | |
Flag9 | ✓ | ✓ | ✓ | |
Flag10 | ✓ | ✓ | ✓ | |
Flag11 | ✓ | ✓ | ✓ | |
Flag12 | ✓ | ✓ | ✓ | |
Flag13 | ✓ | ✓ | ✓ | |
Flag14 | ✓ | ✓ | ✓ | |
Flag15 | ✓ | ✓ | ✓ | |
Flag16 | ✓ | ✓ | ✓ | |
Flag17 | ✓ | ✓ | ✓ | |
Flag18 | ✓ | ✓ | ✓ | |
Flag19 | ✓ | ✓ | ✓ | |
Flag20 | ✓ | ✓ | ✓ | |
Number1 | ✓ | ✓ | ✓ | |
Number2 | ✓ | ✓ | ✓ | |
Number3 | ✓ | ✓ | ✓ | |
Number4 | ✓ | ✓ | ✓ | |
Number5 | ✓ | ✓ | ✓ | |
Number6 | ✓ | ✓ | ✓ | |
Number7 | ✓ | ✓ | ✓ | |
Number8 | ✓ | ✓ | ✓ | |
Number9 | ✓ | ✓ | ✓ | |
Number10 | ✓ | ✓ | ✓ | |
Number11 | ✓ | ✓ | ✓ | |
Number12 | ✓ | ✓ | ✓ | |
Number13 | ✓ | ✓ | ✓ | |
Number14 | ✓ | ✓ | ✓ | |
Number15 | ✓ | ✓ | ✓ | |
Number16 | ✓ | ✓ | ✓ | |
Number17 | ✓ | ✓ | ✓ | |
Number18 | ✓ | ✓ | ✓ | |
Number19 | ✓ | ✓ | ✓ | |
Number20 | ✓ | ✓ | ✓ | |
Outline Code1 | ✓ | ✓ | ✓ | |
Outline Code1 Index | ✓ | ✓ | ✓ | |
Outline Code2 | ✓ | ✓ | ✓ | |
Outline Code2 Index | ✓ | ✓ | ✓ | |
Outline Code3 | ✓ | ✓ | ✓ | |
Outline Code3 Index | ✓ | ✓ | ✓ | |
Outline Code4 | ✓ | ✓ | ✓ | |
Outline Code4 Index | ✓ | ✓ | ✓ | |
Outline Code5 | ✓ | ✓ | ✓ | |
Outline Code5 Index | ✓ | ✓ | ✓ | |
Outline Code6 | ✓ | ✓ | ✓ | |
Outline Code6 Index | ✓ | ✓ | ✓ | |
Outline Code7 | ✓ | ✓ | ✓ | |
Outline Code7 Index | ✓ | ✓ | ✓ | |
Outline Code8 | ✓ | ✓ | ✓ | |
Outline Code8 Index | ✓ | ✓ | ✓ | |
Outline Code9 | ✓ | ✓ | ✓ | |
Outline Code9 Index | ✓ | ✓ | ✓ | |
Outline Code10 | ✓ | ✓ | ✓ | |
Outline Code10 Index | ✓ | ✓ | ✓ | |
Start1 | ✓ | ✓ | ✓ | |
Start2 | ✓ | ✓ | ✓ | |
Start3 | ✓ | ✓ | ✓ | |
Start4 | ✓ | ✓ | ✓ | |
Start5 | ✓ | ✓ | ✓ | |
Start6 | ✓ | ✓ | ✓ | |
Start7 | ✓ | ✓ | ✓ | |
Start8 | ✓ | ✓ | ✓ | |
Start9 | ✓ | ✓ | ✓ | |
Start10 | ✓ | ✓ | ✓ | |
Text1 | ✓ | ✓ | ✓ | ✓ |
Text2 | ✓ | ✓ | ✓ | |
Text3 | ✓ | ✓ | ✓ | |
Text4 | ✓ | ✓ | ✓ | |
Text5 | ✓ | ✓ | ✓ | |
Text6 | ✓ | ✓ | ✓ | |
Text7 | ✓ | ✓ | ✓ | |
Text8 | ✓ | ✓ | ✓ | |
Text9 | ✓ | ✓ | ✓ | |
Text10 | ✓ | ✓ | ✓ | |
Text11 | ✓ | ✓ | ✓ | |
Text12 | ✓ | ✓ | ✓ | |
Text13 | ✓ | ✓ | ✓ | |
Text14 | ✓ | ✓ | ✓ | |
Text15 | ✓ | ✓ | ✓ | |
Text16 | ✓ | ✓ | ✓ | |
Text17 | ✓ | ✓ | ✓ | |
Text18 | ✓ | ✓ | ✓ | |
Text19 | ✓ | ✓ | ✓ | |
Text20 | ✓ | ✓ | ✓ | |
Text21 | ✓ | ✓ | ✓ | |
Text22 | ✓ | ✓ | ✓ | |
Text23 | ✓ | ✓ | ✓ | |
Text24 | ✓ | ✓ | ✓ | |
Text25 | ✓ | ✓ | ✓ | |
Text26 | ✓ | ✓ | ✓ | |
Text27 | ✓ | ✓ | ✓ | |
Text28 | ✓ | ✓ | ✓ | |
Text29 | ✓ | ✓ | ✓ | |
Text30 | ✓ | ✓ | ✓ |
Enterprise Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Enterprise | ✓ | ✓ | ||
Enterprise Data | ✓ | |||
Enterprise Duration1 Units | ✓ | ✓ | ||
Enterprise Duration2 Units | ✓ | ✓ | ||
Enterprise Duration3 Units | ✓ | ✓ | ||
Enterprise Duration4 Units | ✓ | ✓ | ||
Enterprise Duration5 Units | ✓ | ✓ | ||
Enterprise Duration6 Units | ✓ | ✓ | ||
Enterprise Duration7 Units | ✓ | ✓ | ||
Enterprise Duration8 Units | ✓ | ✓ | ||
Enterprise Duration9 Units | ✓ | ✓ | ||
Enterprise Duration10 Units | ✓ | ✓ | ||
Enterprise Unique ID | ✓ | ✓ | ✓ |
Resource Assignment
Core Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Actual Cost | ✓ | ✓ | ✓ | |
Actual Finish | ✓ | ✓ | ✓ | |
Actual Overtime Cost | ✓ | ✓ | ✓ | |
Actual Overtime Work | ✓ | ✓ | ✓ | |
Actual Start | ✓ | ✓ | ✓ | |
Actual Work | ✓ | ✓ | ✓ | ✓ |
Actual Work Protected | ✓ | |||
Assignment Delay | ✓ | ✓ | ✓ | |
Assignment GUID | ✓ | ✓ | ||
Assignment Resource GUID | ✓ | ✓ | ||
Assignment Task GUID | ✓ | ✓ | ||
Assignment Units | ✓ | ✓ | ✓ | ✓ |
Budget Cost | ✓ | ✓ | ||
Budget Work | ✓ | ✓ | ||
Calculate Costs From Units | ✓ | ✓ | ✓ | ✓ |
Confirmed | ✓ | ✓ | ✓ | |
Cost | ✓ | ✓ | ✓ | ✓ |
Cost Rate Table | ✓ | ✓ | ✓ | |
Cost Variance | ✓ | ✓ | ✓ | |
Created | ✓ | ✓ | ✓ | |
Finish | ✓ | ✓ | ✓ | ✓ |
Finish Variance | ✓ | ✓ | ✓ | |
Hyperlink | ✓ | ✓ | ✓ | |
Hyperlink Address | ✓ | ✓ | ✓ | |
Hyperlink Data | ✓ | ✓ | ✓ | |
Hyperlink Screen Tip | ✓ | ✓ | ✓ | |
Hyperlink Subaddress | ✓ | ✓ | ✓ | |
Leveling Delay | ✓ | ✓ | ✓ | |
Leveling Delay Units | ✓ | ✓ | ||
Linked Fields | ✓ | ✓ | ✓ | |
Notes | ✓ | ✓ | ✓ | |
Overtime Work | ✓ | ✓ | ✓ | |
Owner | ✓ | ✓ | ||
Percent Work Complete | ✓ | ✓ | ✓ | ✓ |
Rate Source | ✓ | ✓ | ✓ | ✓ |
Regular Work | ✓ | ✓ | ✓ | |
Remaining Assignment Units | ✓ | ✓ | ✓ | ✓ |
Remaining Cost | ✓ | ✓ | ✓ | |
Remaining Overtime Cost | ✓ | ✓ | ✓ | |
Remaining Overtime Work | ✓ | ✓ | ✓ | |
Remaining Work | ✓ | ✓ | ✓ | ✓ |
Resource Request Type | ✓ | ✓ | ||
Resource Unique ID | ✓ | ✓ | ✓ | ✓ |
Response Pending | ✓ | ✓ | ✓ | |
Resume | ✓ | ✓ | ✓ | |
Start | ✓ | ✓ | ✓ | ✓ |
Start Variance | ✓ | ✓ | ✓ | |
Stop | ✓ | ✓ | ✓ | |
Task Unique ID | ✓ | ✓ | ✓ | ✓ |
Team Status Pending | ✓ | ✓ | ✓ | |
Timephased Actual Overtime Work | ✓ | ✓ | ✓ | |
Timephased Actual Work | ✓ | ✓ | ✓ | |
Timephased Work | ✓ | ✓ | ✓ | |
Unique ID | ✓ | ✓ | ✓ | ✓ |
Variable Rate Units | ✓ | ✓ | ||
Work | ✓ | ✓ | ✓ | ✓ |
Work Contour | ✓ | ✓ | ✓ | |
Work Variance | ✓ | ✓ | ✓ |
Baseline Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Baseline1 Budget Cost | ✓ | ✓ | ||
Baseline1 Budget Work | ✓ | ✓ | ||
Baseline1 Cost | ✓ | ✓ | ✓ | |
Baseline1 Finish | ✓ | ✓ | ✓ | |
Baseline1 Start | ✓ | ✓ | ✓ | |
Baseline1 Work | ✓ | ✓ | ✓ | |
Baseline2 Budget Cost | ✓ | ✓ | ||
Baseline2 Budget Work | ✓ | ✓ | ||
Baseline2 Cost | ✓ | ✓ | ✓ | |
Baseline2 Finish | ✓ | ✓ | ✓ | |
Baseline2 Start | ✓ | ✓ | ✓ | |
Baseline2 Work | ✓ | ✓ | ✓ | |
Baseline3 Budget Cost | ✓ | ✓ | ||
Baseline3 Budget Work | ✓ | ✓ | ||
Baseline3 Cost | ✓ | ✓ | ✓ | |
Baseline3 Finish | ✓ | ✓ | ✓ | |
Baseline3 Start | ✓ | ✓ | ✓ | |
Baseline3 Work | ✓ | ✓ | ✓ | |
Baseline4 Budget Cost | ✓ | ✓ | ||
Baseline4 Budget Work | ✓ | ✓ | ||
Baseline4 Cost | ✓ | ✓ | ✓ | |
Baseline4 Finish | ✓ | ✓ | ✓ | |
Baseline4 Start | ✓ | ✓ | ✓ | |
Baseline4 Work | ✓ | ✓ | ✓ | |
Baseline5 Budget Cost | ✓ | ✓ | ||
Baseline5 Budget Work | ✓ | ✓ | ||
Baseline5 Cost | ✓ | ✓ | ✓ | |
Baseline5 Finish | ✓ | ✓ | ✓ | |
Baseline5 Start | ✓ | ✓ | ✓ | |
Baseline5 Work | ✓ | ✓ | ✓ | |
Baseline6 Budget Cost | ✓ | ✓ | ||
Baseline6 Budget Work | ✓ | ✓ | ||
Baseline6 Cost | ✓ | ✓ | ✓ | |
Baseline6 Finish | ✓ | ✓ | ✓ | |
Baseline6 Start | ✓ | ✓ | ✓ | |
Baseline6 Work | ✓ | ✓ | ✓ | |
Baseline7 Budget Cost | ✓ | ✓ | ||
Baseline7 Budget Work | ✓ | ✓ | ||
Baseline7 Cost | ✓ | ✓ | ✓ | |
Baseline7 Finish | ✓ | ✓ | ✓ | |
Baseline7 Start | ✓ | ✓ | ✓ | |
Baseline7 Work | ✓ | ✓ | ✓ | |
Baseline8 Budget Cost | ✓ | ✓ | ||
Baseline8 Budget Work | ✓ | ✓ | ||
Baseline8 Cost | ✓ | ✓ | ✓ | |
Baseline8 Finish | ✓ | ✓ | ✓ | |
Baseline8 Start | ✓ | ✓ | ✓ | |
Baseline8 Work | ✓ | ✓ | ✓ | |
Baseline9 Budget Cost | ✓ | ✓ | ||
Baseline9 Budget Work | ✓ | ✓ | ||
Baseline9 Cost | ✓ | ✓ | ✓ | |
Baseline9 Finish | ✓ | ✓ | ✓ | |
Baseline9 Start | ✓ | ✓ | ✓ | |
Baseline9 Work | ✓ | ✓ | ✓ | |
Baseline10 Budget Cost | ✓ | ✓ | ||
Baseline10 Budget Work | ✓ | ✓ | ||
Baseline10 Cost | ✓ | ✓ | ✓ | |
Baseline10 Finish | ✓ | ✓ | ✓ | |
Baseline10 Start | ✓ | ✓ | ✓ | |
Baseline10 Work | ✓ | ✓ | ✓ | |
Baseline Budget Cost | ✓ | ✓ | ||
Baseline Budget Work | ✓ | ✓ | ||
Baseline Cost | ✓ | ✓ | ✓ | |
Baseline Finish | ✓ | ✓ | ✓ | |
Baseline Start | ✓ | ✓ | ✓ | |
Baseline Work | ✓ | ✓ | ✓ | |
Timephased Baseline1 Cost | ✓ | ✓ | ✓ | |
Timephased Baseline1 Work | ✓ | ✓ | ✓ | |
Timephased Baseline2 Cost | ✓ | ✓ | ||
Timephased Baseline2 Work | ✓ | ✓ | ||
Timephased Baseline3 Cost | ✓ | ✓ | ||
Timephased Baseline3 Work | ✓ | ✓ | ||
Timephased Baseline4 Cost | ✓ | ✓ | ||
Timephased Baseline4 Work | ✓ | ✓ | ||
Timephased Baseline5 Cost | ✓ | ✓ | ||
Timephased Baseline5 Work | ✓ | ✓ | ||
Timephased Baseline6 Cost | ✓ | ✓ | ||
Timephased Baseline6 Work | ✓ | ✓ | ||
Timephased Baseline7 Cost | ✓ | ✓ | ||
Timephased Baseline7 Work | ✓ | ✓ | ||
Timephased Baseline8 Cost | ✓ | ✓ | ||
Timephased Baseline8 Work | ✓ | ✓ | ||
Timephased Baseline9 Cost | ✓ | ✓ | ||
Timephased Baseline9 Work | ✓ | ✓ | ||
Timephased Baseline10 Cost | ✓ | ✓ | ✓ | |
Timephased Baseline10 Work | ✓ | ✓ | ✓ | |
Timephased Baseline Cost | ✓ | ✓ | ✓ | |
Timephased Baseline Work | ✓ | ✓ | ✓ |
Custom Fields
Field | MPP8 | MPP9 | MPP12 | MPP14 |
---|---|---|---|---|
Cost1 | ✓ | ✓ | ✓ | |
Cost2 | ✓ | ✓ | ✓ | |
Cost3 | ✓ | ✓ | ✓ | |
Cost4 | ✓ | ✓ | ✓ | |
Cost5 | ✓ | ✓ | ✓ | |
Cost6 | ✓ | ✓ | ✓ | |
Cost7 | ✓ | ✓ | ✓ | |
Cost8 | ✓ | ✓ | ✓ | |
Cost9 | ✓ | ✓ | ✓ | |
Cost10 | ✓ | ✓ | ✓ | |
Date1 | ✓ | ✓ | ✓ | |
Date2 | ✓ | ✓ | ✓ | |
Date3 | ✓ | ✓ | ✓ | |
Date4 | ✓ | ✓ | ✓ | |
Date5 | ✓ | ✓ | ✓ | |
Date6 | ✓ | ✓ | ✓ | |
Date7 | ✓ | ✓ | ✓ | |
Date8 | ✓ | ✓ | ✓ | |
Date9 | ✓ | ✓ | ✓ | |
Date10 | ✓ | ✓ | ✓ | |
Duration1 | ✓ | ✓ | ✓ | |
Duration1 Units | ✓ | ✓ | ✓ | |
Duration2 | ✓ | ✓ | ✓ | |
Duration2 Units | ✓ | ✓ | ✓ | |
Duration3 | ✓ | ✓ | ✓ | |
Duration3 Units | ✓ | ✓ | ✓ | |
Duration4 | ✓ | ✓ | ✓ | |
Duration4 Units | ✓ | ✓ | ✓ | |
Duration5 | ✓ | ✓ | ✓ | |
Duration5 Units | ✓ | ✓ | ✓ | |
Duration6 | ✓ | ✓ | ✓ | |
Duration6 Units | ✓ | ✓ | ✓ | |
Duration7 | ✓ | ✓ | ✓ | |
Duration7 Units | ✓ | ✓ | ✓ | |
Duration8 | ✓ | ✓ | ✓ | |
Duration8 Units | ✓ | ✓ | ✓ | |
Duration9 | ✓ | ✓ | ✓ | |
Duration9 Units | ✓ | ✓ | ✓ | |
Duration10 | ✓ | ✓ | ✓ | |
Duration10 Units | ✓ | ✓ | ✓ | |
Finish1 | ✓ | ✓ | ✓ | |
Finish2 | ✓ | ✓ | ✓ | |
Finish3 | ✓ | ✓ | ✓ | |
Finish4 | ✓ | ✓ | ✓ | |
Finish5 | ✓ | ✓ | ✓ | |
Finish6 | ✓ | ✓ | ✓ | |
Finish7 | ✓ | ✓ | ✓ | |
Finish8 | ✓ | ✓ | ✓ | |
Finish9 | ✓ | ✓ | ✓ | |
Finish10 | ✓ | ✓ | ✓ | |
Flag1 | ✓ | ✓ | ✓ | |
Flag2 | ✓ | ✓ | ✓ | |
Flag3 | ✓ | ✓ | ✓ | |
Flag4 | ✓ | ✓ | ✓ | |
Flag5 | ✓ | ✓ | ✓ | |
Flag6 | ✓ | ✓ | ✓ | |
Flag7 | ✓ | ✓ | ✓ | |
Flag8 | ✓ | ✓ | ✓ | |
Flag9 | ✓ | ✓ | ✓ | |
Flag10 | ✓ | ✓ | ✓ | |
Flag11 | ✓ | ✓ | ✓ | |
Flag12 | ✓ | ✓ | ✓ | |
Flag13 | ✓ | ✓ | ✓ | |
Flag14 | ✓ | ✓ | ✓ | |
Flag15 | ✓ | ✓ | ✓ | |
Flag16 | ✓ | ✓ | ✓ | |
Flag17 | ✓ | ✓ | ✓ | |
Flag18 | ✓ | ✓ | ✓ | |
Flag19 | ✓ | ✓ | ✓ | |
Flag20 | ✓ | ✓ | ✓ | |
Number1 | ✓ | ✓ | ✓ | |
Number2 | ✓ | ✓ | ✓ | |
Number3 | ✓ | ✓ | ✓ | |
Number4 | ✓ | ✓ | ✓ | |
Number5 | ✓ | ✓ | ✓ | |
Number6 | ✓ | ✓ | ✓ | |
Number7 | ✓ | ✓ | ✓ | |
Number8 | ✓ | ✓ | ✓ | |
Number9 | ✓ | ✓ | ✓ | |
Number10 | ✓ | ✓ | ✓ | |
Number11 | ✓ | ✓ | ✓ | |
Number12 | ✓ | ✓ | ✓ | |
Number13 | ✓ | ✓ | ✓ | |
Number14 | ✓ | ✓ | ✓ | |
Number15 | ✓ | ✓ | ✓ | |
Number16 | ✓ | ✓ | ✓ | |
Number17 | ✓ | ✓ | ✓ | |
Number18 | ✓ | ✓ | ✓ | |
Number19 | ✓ | ✓ | ✓ | |
Number20 | ✓ | ✓ | ✓ | |
Start1 | ✓ | ✓ | ✓ | |
Start2 | ✓ | ✓ | ✓ | |
Start3 | ✓ | ✓ | ✓ | |
Start4 | ✓ | ✓ | ✓ | |
Start5 | ✓ | ✓ | ✓ | |
Start6 | ✓ | ✓ | ✓ | |
Start7 | ✓ | ✓ | ✓ | |
Start8 | ✓ | ✓ | ✓ | |
Start9 | ✓ | ✓ | ✓ | |
Start10 | ✓ | ✓ | ✓ | |
Text1 | ✓ | ✓ | ✓ | |
Text2 | ✓ | ✓ | ✓ | |
Text3 | ✓ | ✓ | ✓ | |
Text4 | ✓ | ✓ | ✓ | |
Text5 | ✓ | ✓ | ✓ | |
Text6 | ✓ | ✓ | ✓ | |
Text7 | ✓ | ✓ | ✓ | |
Text8 | ✓ | ✓ | ✓ | |
Text9 | ✓ | ✓ | ✓ | |
Text10 | ✓ | ✓ | ✓ | |
Text11 | ✓ | ✓ | ✓ | |
Text12 | ✓ | ✓ | ✓ | |
Text13 | ✓ | ✓ | ✓ | |
Text14 | ✓ | ✓ | ✓ | |
Text15 | ✓ | ✓ | ✓ | |
Text16 | ✓ | ✓ | ✓ | |
Text17 | ✓ | ✓ | ✓ | |
Text18 | ✓ | ✓ | ✓ | |
Text19 | ✓ | ✓ | ✓ | |
Text20 | ✓ | ✓ | ✓ | |
Text21 | ✓ | ✓ | ✓ | |
Text22 | ✓ | ✓ | ✓ | |
Text23 | ✓ | ✓ | ✓ | |
Text24 | ✓ | ✓ | ✓ | |
Text25 | ✓ | ✓ | ✓ | |
Text26 | ✓ | ✓ | ✓ | |
Text27 | ✓ | ✓ | ✓ | |
Text28 | ✓ | ✓ | ✓ | |
Text29 | ✓ | ✓ | ✓ | |
Text30 | ✓ | ✓ | ✓ |